亚洲AV日韩AⅤ综合手机在线观看,激情婷婷久久综合色,欧美色五月婷婷久久,久久国产精品99久久人人澡

  • <abbr id="uk6uq"><abbr id="uk6uq"></abbr></abbr>
  • <tbody id="uk6uq"></tbody>
  • 職稱英語(yǔ)考試真題綜合類A補(bǔ)全短文

    時(shí)間:2024-09-25 10:28:42 詩(shī)琳 職稱英語(yǔ) 我要投稿
    • 相關(guān)推薦

    2024年職稱英語(yǔ)考試真題綜合類A補(bǔ)全短文

      在平時(shí)的學(xué)習(xí)中,大家都沒(méi)少背知識(shí)點(diǎn)吧?知識(shí)點(diǎn)就是“讓別人看完能理解”或者“通過(guò)練習(xí)我能掌握”的內(nèi)容。還在苦惱沒(méi)有知識(shí)點(diǎn)總結(jié)嗎?下面是小編為大家收集的2024年職稱英語(yǔ)考試真題綜合類A補(bǔ)全短文知識(shí)點(diǎn),歡迎大家借鑒與參考,希望對(duì)大家有所幫助。

    2024年職稱英語(yǔ)考試真題綜合類A補(bǔ)全短文

      The World.s Longest Bridge

      Rumor has it that a legendary (傳說(shuō)的) six-headed monster lurks in the deep waters of the Tyrrhenian Sea between Italy and the island of Sicily._________ (46) When completed in 2010,the worlds longest bridge will weigh nearly 300,000 tons--equivalent to the iceberg that sank the Titanic-- and stretch 5 kilometers long. "Thats nearly 50 percent longer than any other bridge ever built," says structural engineer Shane Rixon.

      _________ (47) Theyre suspension bridges, massive structures built to span vast water channels or gorges (峽谷). A suspension bridge needs just two towers to shoulder the structures mammoth ( 巨大的 )weight, thanks to hefty (高強(qiáng)度的)supporting cables slung between the towers and anchored firmly in deep pools of cement at each end of the bridge. The Messina Strait Bridge will have two 54, 100-ton towers, which will support most of the bridge s load. The beefy (結(jié)實(shí)的 )cables of the bridge, each 1.2 meter in diameter, will hold up the longest and widest bridge deck ever built.

      When construction begins on the Messina Strait Bridge in 2005, the first job will be to erect two 370 meter-tall steel towers. _________ (48) Getting these cables up will be something. Its not just their length -- totally 5.3 kilometers -- but their weight. _________ (49)

      After lowering vertical "suspender" cables from the main cables, builders will erect a 60 meter-wide 54,630-ton steel roadway, or deck--wide enough to accommodate 12 lanes of traffic.

      The decks weight will pull down on the cables with a force of 70,500 tons. In return, the cables yank (拽) up against their firmly rooted anchors with a force of 139,000 tons--equivalent to the weight of about 100,000 cars. Those anchors are essential. _________ (50)

      A. Some environmentalists are against the project on biological grounds.

      B. What do the worlds longest bridges have in common?

      C. If true, one day you might spy the beast while zipping (呼嘯而過(guò)) across the Messina Strait Bridge.

      D. Theyre what will keep the bridge from going anywhere.

      E. The second job will be to pull two sets of steel cables across the strait, each set being a bundle of 44,352 individual steel wires.

      F. They will tip up the scales at 166,500 tons--more than half the bridges total mass.

      試題答案及解析

      46.C。選項(xiàng)C中有一個(gè)關(guān)鍵詞beast,與第一句中的monster相呼應(yīng)。所以C是答案。

      47.B。第二段第二句的主語(yǔ)是they。由于表語(yǔ)是suspension bridges,they替代的一定是前面句子出現(xiàn)過(guò)的bridges。六個(gè)選項(xiàng)中,只有B含有bridges。填在第二段段首,意思連貫。

      48.E?瞻滋幥懊娴木渥又杏衪he first job這幾個(gè)詞。有first,必有second/then。六個(gè)選項(xiàng)中,只有E含有the second job,所以E是答案。

      49.F。空白處前面的句子說(shuō)的是,把這些吊索吊高定位是有難度的,不僅僅由于它們很長(zhǎng),還由于它們很重。后面應(yīng)該接著說(shuō)吊索的情況,選項(xiàng)F具體地介紹了它們的重量。

      50.D。空白處前面的句子說(shuō)的是,橋樁很重要。后面接著還應(yīng)該說(shuō)橋樁的事情,選項(xiàng)D解釋了橋樁的作用,故選D。

    【職稱英語(yǔ)考試真題綜合類A補(bǔ)全短文】相關(guān)文章:

    2017年職稱英語(yǔ)考試綜合類B補(bǔ)全短文訓(xùn)練題03-14

    2016職稱英語(yǔ)綜合類C級(jí)考試真題補(bǔ)全短文03-28

    綜合類C級(jí)職稱英語(yǔ)考試真題03-08

    2017年職稱英語(yǔ)考試綜合類B補(bǔ)全短文專項(xiàng)練習(xí)題03-14

    2017年職稱英語(yǔ)考試?yán)砉ゎ怉補(bǔ)全短文訓(xùn)練題03-14

    2016職稱英語(yǔ)衛(wèi)生類B級(jí)考試真題補(bǔ)全短文03-28

    2017年職稱英語(yǔ)考試?yán)砉ゎ怌補(bǔ)全短文訓(xùn)練題03-15

    職稱英語(yǔ)綜合類C級(jí)補(bǔ)全短文提高練習(xí)匯總02-28

    2016年職稱英語(yǔ)考試真題及答案綜合類B級(jí)詞匯選項(xiàng)03-11