亚洲AV日韩AⅤ综合手机在线观看,激情婷婷久久综合色,欧美色五月婷婷久久,久久国产精品99久久人人澡

  • <abbr id="uk6uq"><abbr id="uk6uq"></abbr></abbr>
  • <tbody id="uk6uq"></tbody>
  • 工程師英文簡(jiǎn)歷范文精選

    發(fā)布時(shí)間:2017-10-10 編輯:文幗 手機(jī)版

      下列精選的工程師英文簡(jiǎn)歷范文包括IE工程師英文簡(jiǎn)歷范文和高級(jí)電子工程師英文簡(jiǎn)歷范文,感興趣的朋友可以參考一下哦!

      IE工程師英文簡(jiǎn)歷范文一

      Name: Mr. R Gender: Male

      Wedlock: Single Nation: Han

      Residence: Guangdong-Qingyuan Age: 28

      Location: Guangdong-Dongguan Height: 173cm

      Target Locations: Guangdong

      Target Positions: Industry/Factories-Industrial Engineer

      Industry/Factories-Production Management Clerk

      Industry/Factories-Technic Engineer

      Target Jobs: Industrial Engineer、 Lean Engineer

      Education

      2005-09 ~ 2009-07 GuangDong University of Technology Industral Engineering Bachelor Degree

      Training

      2008-12 ~ 2008-12 Guopei Certificate Internal Quality Auditor Training &Qualification

      【company name】 (2011-07 ~ Present)

      Company Type: Private Enterprise Company Category: Electrical,Micro-electronics

      Job Title: Industrial Engineer Positions: Industrial Engineer

      Job Description: 1.NPI: process planning, fixture and equipment planning, prepare process checklist

      2.Standard time and capacity evaluation, line balance and prepare SOP for new products

      3.Maintain the usage of the consumptive material, standard time and capacity

      4.Perform line balance and improve process to rise capacity

      5.Design and improve the tools and fixture in the work site

      6.Monitor the efficiency of the production line, analyze these reasons manpower, machine, material , environment, method, push the relative dept to solve issues

      7.Kaizen project planning and push: Auto-machine introduce, production way optimize, manpower and material saving, etc

      Career Highlight:

      1.Auto-welding machine introduce: welding process operator saving(16 operators-12 operators=4 operators), line balance rate upgrade from 83% to 91%, solder wire saving 3.2grams, cost of solder wire saving 1.6 yuan RMB for each PCBA.

      2.Auto-packaging production line planning and implement: master carton packaging operator saving, every production line deploy 2 packaging operators for 8 lines, after introduce the new equipment it takes only 5 operator to seal the master carton

      3.Rear cabinet pre-process and final assembly combine: manpower saving include 1 conveyer, 1 visual inspector, 1 loading operator and 1unloading operator(total 4 operators), and saving the usage of bubble bag and partition board

      4.Decorative plate incoming package improvement: change the package material and simplify package way to reduce pack cost(from 0.13yuan to 0.09yuan RMB) and cut down unpack operation time( saving 12 seconds)

      5.Cooperate with RD to change PCBA process from dispensing process to solder paste process, in order to cut down welding failure rate after wave-soldering. In this case charge of PCBA fixture design and improvement evaluation(repairing welding time 140sec reduce to 70sec,4 repair welding operators cut down to 2 operators)

      6.According to the small order quantity of the product, study the less humanizing process for small products to reduce the change over loss time(38 operators*30minute-

      20 operator*40minutes=340minutes) and improve 8% of the motion effective rate

      Reason for Leaving: Not very good economic benifit of the company,little chance to promote both in position and welfare

      【company name】 (2009-07 ~ 2011-06)

      Company Type: Joint Venture Company Category: Electrical,Micro-electronics

      Job Title: Junior Engineer Positions: Industrial Engineer

      Job Description: 1.Establish and maintain the standard labor time, perform line balance to improve production capacity

      2.Load capacity assessment: Base on the MPS and the capacity of production line to forecast the workforce requirement

      3.Prepare the cost study report for new products, labor rate evaluate basis on factory operating cost, provide quotation to customer for special process

      4.Prepare the workshop layout and line layout design basis on logistics analysis

      5.Research and develop new packaging method, develop new suppliers for packing material, make order for new packing material and follow up the schedule

      6.Deal with customer complaint and settle products packaging issue, improve packaging method to satisfy customer

      Career Highlight:

      1. Function test man-machine operation improvement: cooperate with TE to disassemble

      and rearrange test item, and modify the way of program display in the monitor, in order

      to realize one person simultaneously operate two test machine

      2. Line balance improvement: provide the cycle time of each model to set up assemble line speed, and upgrade the line balance rate to 80% above for all model

      Reason for Leaving: Not a very good department to pratice and learn IE skill,seek more chance to enhance myself

      Special Skills

      Professional Title:

      Computer Level: national computer exam. grade 3

      Computer Skills: 1.Be familiar with Windows,be good at Microsoft office software;

      2.Have passed National Computer Rank Exam of database technology ;

      3.Mastery in Auto CAD of computer aided design software;

      Strengths: 1.Be familiar with method study and standard time measurement, know well about Work study technology including 5W1H inquire skill and ECRS four principles

      2.Mastery in IE seven techniques, comprehend production management essentials

      And the activity about 5S.

      3.Be familiar with logistics analysis during the production process, be capable of

      Facility planning and machine layout

      4.Know about the basis quality management tools, such as Seven QC Methods and FMEA technique

      Language Skills

      Chinese: Good Cantonese: Good

      English Level: CET-4

      English: Good

      Career Objective

      Career Direction: A position as IE engineer or Lean engineer which will use the IE concept and lean production to reduce the cost of enterprise running ,promote the competitive strength,as a result to achieve the win-win target with enterprise.

      Requirements:

      Self Info.

      Self Assessment: 1.Bachelor degree in Industrial Engineering, have good sense in cost down, and have successful case of improvement

      2.Worked in Taiwan electronic company for almost two year, be familiar with SMT, DIP, repair welding, final assembly, test and packing process

      3.Strong hands-on skills, have experience in guiding operation for new production first MP

      4.Good skill in Auto-CAD, can design and make fixture in the workshop

      5.Good communication and organization skill in working with other department, have some experience in training

      6.Responsibility for work and a man of great loyalty, able to learn, patient an

      高級(jí)電子工程師英文簡(jiǎn)歷范文二

      ELECTRONICS ENGINEER(Experienced)

      Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.

      BACKGROUND SUMMARY

      Over eleven years of extensive computer/electronics experience.Versed in both digital and analog electronics withspecific emphasis on computer hardware/software.Special expertise in system and component evaluation.Network supervisor responsible for installing/maintaining Arcnet LAN system.Proficient in assembly and C programming languages.Excelent communication skills including written,verbal and interpersonal.

      PROFESSIONAL WORK EXPERIENCE

      Stevenson Data Systems,Los Angeles,CA 1981-1993

      Components Evaluation Engineer 1992-1993

      Responsible for the characterization and evaluation of, and approved vendors list for:Power supplies,oscillators,crystals,and programmable logic used in desktop and laptop computers.Evaluated and recommended quality components that increased product profitability.Created adn developed power supply test plan used for evqluating third party power supplies.Interacted with vendors to resolve problems associated with components qualification.Technical advisor for Purchasing.Promoted to engineer II.

      Design Evaluation Engineer 1990-1992

      Evaluated new computer product designs ,solving environmental problems on prototype computers.Conducted systems analysis on new computer profucts to ensure hardware,software and mechanical design integrity.Designed hardware and software for PC,ISA bus programmable load board used for environmental testing.Performed reliability lift testing on computer systems.Installed/maintained 20 user.Novell,Arcnet LAN system.Examined system and sub-system susceptibility to electrostatic discharge in order to meet IEC-801-2 industry standards.Analyzed complete power and load of computer system and subsystem to verify power and load estimations.

      Assistant Engineer 1981-1990

      Performed extensive hardware evaluation ion prototype computers,tested prototype units for timing violation using the latest state-of-the-art test equipment,digital oscilloscopes and logic analyzers.Performed emvironmental,ESD and acoustic testing.Designed and built a power-up test used to test prototype computers during cold boot.

      EDUCATION

      Bachelor of Science in Electrical Engineering

      --University of Southern California 1990

      Associate in Engineering Electronics

      --University of Southern California 1981

      Job descriptions emphasize candidate's accomploshments.

      Work history is stated in reverse chronological order,with most recent employment listed first

    欄目推薦
    最新推薦
    熱門推薦